@larstransportworld@mastodon.social
Post #4304792
2026-07-28 20:52 UTC
There are construction works at Aarhus H. In the late evening, replacement buses are provided for all trains. The layout also seems to have changed, for example, the flyover on the line to Aalborg appears to have disappeared. The catenary wires and masts are still missing. #StrandbyMode
Replies (1)
-
@larstransportworld@mastodon.social 2026-07-28 20:55
Our Intercity train to Aalborg is waiting for us on the same track as a GoCollective LINT train. I assume the double occupancy is due to the ongoing construction work. This will probably be the last comfy rubber-nose train ride of the trip! The catenary seems ready, except at Aarhus Hovedbanegård. #StrandbyMode