@heliomass@cosocial.ca Looking at how much CDPQ invested to get power to its REM including its own 315kv line and substation "Poste des Patriotes" at the Deux Montagnes maintenance facility connected directly to the big Poste Chenier hub. Brossard is right next to Poste La Prairie so I assume it draws from it. Not sure where else they draw power from.
I would have expected much better reliability of the power system. Oh wait, SNC Lavalin is involved :-(