Elektrine lite

← Feed

@dominicstucki@urbanists.social

Post #3814367

2026-07-14 16:22 UTC

The second Corail of the day would have passed perfectly after sunrise. But remember, it was still cancelled. Instead, this construction train, very probably from tonight's track works around Maintenon, 80 km away (!), passed from behind. #LaFranceTractée

Replies (1)

  • And then, for the last time on this trip, the lovely grey-orange combination that is the livrée béton shimmered in the distance and the unmistakable singing of a Corail train at speed filled the air. 🥰 #LaFranceTractée

    Open ##3814366