@brianb@fosstodon.org For a grid-tied system, you're probably going to need your plans approved by your local utility before you start building.
Replies (1)
-
@brianb@fosstodon.org 2026-05-13 01:30
@brianvastag@mas.to yeah I know the electrical inspector, so not too worried about that part of it. The local utility engineer is also really responsive.