Elektrine lite

← Feed

@brianvastag@mas.to

Post #2953503

2026-05-13 01:06 UTC

@brianb@fosstodon.org For a grid-tied system, you're probably going to need your plans approved by your local utility before you start building.

Replies (1)

  • @brianb@fosstodon.org 2026-05-13 01:30

    @brianvastag@mas.to yeah I know the electrical inspector, so not too worried about that part of it. The local utility engineer is also really responsive.

    Open ##2953504