Post #2728774
2026-05-11 22:59 UTC
@jd@ottawa.place @EdwinG@mstdn.moimeme.ca If Ottawa were in control, t would get the money to rebuild the tracks with more gentle curve between Hurdman and the bdrige over river. (start curve right at exit of station).
Replies (0)
No replies.