Post #2506768
2025-11-30 17:53 UTC
@FediThing@social.chinwag.org @yosh@toot.yosh.is
While the new MAX could have.. probably should have been an entirely new type rating (requiring complete pilot retraining), the MCAS system itself wasn't an inherintly bad engineering solution to a problem. The real fault was cutting corners in its implementation.
Boeing 737 MAX MCAS will be a case study in engineering schools for decades on how otherwise good engineering solutions are sabotaged by executive cost cutting.
3/3
Replies (0)
No replies.