Elektrine lite

← Feed

@North@chaos.social

Post #4211050

2026-07-26 21:36 UTC

Did a little more work in the shop. Finished the corners of the lab rooms with angle iron. Installed lights and a power drop for the island of stuff under the bridge. Still need to wire it. The outlet is an l5-20r locking receptacle so it won't pull out and I just bought a heavy duty power strip and replaced the plug with a matching l5-20p plug. The big bench still needs a few sheets of osb and the mdf bench top needs a few coats of polyurethane. Almost ready to start working on the labs.

Replies (0)

No replies.