If this isn't bureaucracy in France in a nutshell ๐Ÿ˜… Sign outside of a relatively small wind farm giving chronology of the project, translated to English, it reads: 1998 - project starts 2002 - applied for a construction permit ๐Ÿคž ๐Ÿฆ— ... ๐Ÿฆ— 2018 - construction starts ๐Ÿ˜… 2020 - construction ends 2021 - commissioning and grid connection

Replies (5)

  • @kirk@social.coop 2026-07-11 23:27

    A reminder you can literally build your own (admittedly, much smaller) wind turbine using a Piggott turbine design, by getting in contact with the Wind Empowerment network at https://windempowerment.org/ . No construction permit needed ๐Ÿ˜

    Open ##3749762

  • @kirk@social.coop Something else happend in that 16 year gap to massively delay the project. Funding? ๐Ÿ™‚ This is the equivalent of a gap in your CV ๐Ÿ˜‰

    Open ##3801706

  • @kirk@social.coop 2026-07-11 23:15

    I don't know the actual history, maybe there is a good reason... but I enjoyed seeing this as someone often refreshing various french government websites to check on the status of a "depot de demande de" something or other (no construction permits, though).

    Open ##3807710

  • @kirk@social.coop 2026-07-11 23:19

    2.3 MW turbines it seems (E-70?)

    Open ##3807711

  • @cian@post.lurk.org 2026-07-12 01:25

    @kirk@social.coop If this was a British project, then it would have finally been cancelled in 2021 after somehow spending more than 10x what a wind farm should cost.