Post #3677621
2026-07-08 13:51 UTC
Replies (1)
-
@Chzikken_1486@poa.st 2026-07-08 14:35
@RR@poa.st There are several stakeholders who caused this. #1 being the structural engineering company who did the design. Probably zero investigation into the structure (to save money). #2 being the developer putting pressure on the master engineering firm (JMV Associates) and the Prime contractor to meet a deadline. #3 Prime contractor's "means and methods" to do the work. A lot of times they cut corners and use this as an excuse, bypassing engineering standards. #4 "Independent inspection or 3rd party inspectors". Usually pretty worthless. They show up to the site for a short while and bitch about tiny ticky tacky shit while ignoring those YUGE CRACKS IN THE COLUMNS. Then go do a 3-hour lunch. #5 Master engineering firm (Engineer of Record (EOR). Takes all the credit (and money) because they are a minority owned business that doesn't do any of the work (farms it out). Blames everyone else if the project fails. >I was invested in a $4B project with Fed/State/City funding with about 70 different contractors/subs. What I saw behind the curtain is what you would expect. It was like 10 seasons of Survivor rolled into 4.