Elektrine lite

← Feed

@edintone@mastodon.green

Post #2825160

2026-05-24 13:54 UTC

Oh, the sad irony! Mile for mile, the Lower Thames Crossing (LTC) is likely to be more expensive than HS2. The latest LTC current cost estimate is at least £11 billion for 14.3 miles of ‘smart’ motorway and tunnel. #rail #roads #infrastructure #HS2 https://transportactionnetwork.org.uk/lower-thames-crossing-repeats-hs2-mistakes-and-costs-more-per-mile/

Replies (0)

No replies.