Elektrine lite

← Feed

@phil_stevens@mastodon.nz

Post #2800148

2026-05-13 22:31 UTC

@BobLefridge@mastodon.nz @futuresprog@mastodon.nzoss.nz @JulianOliver@mastodon.social Basically, if your business plan has 1 GW on it, all you need is a piece of land with a shed on it and a genset powering a rack with a few GPU blades in it. Call that Phase One and send out the press releases saying it's operational.

Replies (1)

  • @phil_stevens@mastodon.nz @BobLefridge@mastodon.nz @futuresprog@mastodon.nzoss.nz Reminiscent of what Luxon did with the $7.3B investment Amazon datacenter in Auckland, that then later proceeded to not exist.

    Open ##2800149