Post #2632540
2026-05-05 17:01 UTC
When we expanded at EverQuote, we launched several verticals at the same time instead of sequencing. The supply-side cold start problem does not get cheaper when you run it in parallel. You have to build a real flywheel in one vertical before the next. We learned this the expensive way.
Replies (0)
No replies.