Elektrine lite

← Feed

@msmamet@mastodon.social

Post #2632540

2026-05-05 17:01 UTC

When we expanded at EverQuote, we launched several verticals at the same time instead of sequencing. The supply-side cold start problem does not get cheaper when you run it in parallel. You have to build a real flywheel in one vertical before the next. We learned this the expensive way.

Replies (0)

No replies.