Elektrine lite

← Feed

@xia@lemmy.ca

The original contractors in the TENET universe must have felt odd, installing shattered glass into a new frame and being unable to spackle-out bullet holes in the walls they were building...

2026-04-22 04:07 UTC

nor able to sweep up brick dust on the floor for decades because it is “destined” to be reverse-bullet damage that is fixed in the future. (In the movie, you see them walk into a pre-damaged room that is later ‘repaired’ by the inverted gunfire that caused it)

Replies (4)