Elektrine lite

← Feed

@ninkosan@mas.to

Post #1598022

2026-04-10 09:49 UTC

@sephster @robhawkes national grid have some info on the various projects they have going on to help fix this: https://www.nationalgrid.com/the-great-grid-upgrade

Replies (1)

  • @guardeddon@mas.to 2026-04-10 10:26

    @ninkosan @sephster @robhawkes Offshore survey for EGL5 seabed route is presently underway (3x OI ‘Armada’ vessels presently engaged) & ‘WGL2’ route survey is perhaps now complete (Fugro leading on that). Yet, some time remains before the interconnectors will be operational.

    Open ##1598023